FAQs

Yes, Concrete Visions is Licensed, Bonded, and Insured. License #731292.
After pouring, we recommend 2-3 days before walking on the surface.
After pouring, the concrete needs at least 14 days to cure before we recommend driving on it.
We always recommend applying a sealer for maximum definition of color.
After pouring new concrete we wait 30 days for the concrete to cure before applying a sealer. We advise to reapply every 1-2 years due to wear and tear.
Base rock helps provide a solid foundation underneath your concrete to help with expansion of soil we recommend at least 2-4 inches of compacted base rock under any concrete.
At Concrete visions we always reinforce our concrete with rebar to help prevent lifting and separating of concrete.
When pouring anything from a patio to a walkway we recommend a minimum of 4 inches depending on project.
Due to hot and cold weather and expansion and movement of soil there are no 100% guarantees that the concrete won’t crack. However, our professionals take all the necessary steps to help prevent this. Such as, installing joint patterns in all the necessary locations to avoid cracks, and with expansion felt against other existing concrete to prevent any buckling and lifting of concrete. As well as doweling into existing concrete, our rebar installation, and our compaction of base rock.
If you have any other questions about your project please feel free to contact us anytime at 925.634.1033 or via email on our contact page.